the solid steel wheel is mainly used to reduce the friction of the mine car on the ground so that the mining car can be walked. the rail wheel is the same as the bicycle wheel, reduce frictin, so mining car can move safely and quickly, which reduces the wear and tear of the machine and reduces the resistance, which also reduces the manpower. so the life of the underground mining car can be used longer.
mining cart wheel set basic information1. material: cast steel or cast iron; 3. loading capacity: 1-25 tons, each one is ok; 4. wheel sets gauge: 600mm, 762mm, 900mm, and etc; 5. the type of the wheels: hollow wheel sets and solid wheel sets; 6. the diameter of the wheels: 300mm, 350mm, 400mm, 450mm; 7. the material of the axle: 45# steel, or q235; 8. the quantity of each wheel's bearing: two; 9. the material of the bearing: lyc32212, conical roller bearing, deep groove ball bearing; 10. weight: 70kg. | |
mining cart wheel set design there are strict requirements for the assembly pressure and press-fit process of the axle and the wheel. the inner distance of the mine wheel must be within in 1353±3mm. in order to ensure the smooth operation of the mining vehicles, reduce the wheel-rail interaction force and running resistance, eccentricity of the axle journal and the wheel tread, as well as the journal taper, must not exceed the specified limits. |
model | mine car weight kg | track mm | wheel diameter | max axle distance of wheels | min distance of covers | axle diameter |
zbl600/300 | ≤2400 | 600 | 300 | 808 | 510 | 60 |
zbl762/300 | 762 | 970 | 672 | |||
zbl900/300 | 900 | 1108 | 810 | |||
zbl600/350 | ≤6700 | 600 | 350 | 850 | 490 | 80 |
zbl762/350 | 762 | 1012 | 652 | |||
zbl900/350 | 900 | 1150 | 790 | |||
zbl600/400 | ≤9000 | 600 | 400 | 870 | 476 | 95 |
zbl762/400 | 762 | 1032 | 638 | |||
zbl900/400 | 900 | 1170 | 776 |
a: we are a manufacturere with 7 branch factories and 6 overseas offices.
a: generally, within 15-25 days after deposit received.
a: warmly welcome! once we have your schedule, we will arrange the professional engineers and salesperson to follow up your case.
a: available upon request.
a: tt b. western union c. lc d.upon request
a: yes. please inform us formally before our production and confirm the design firstly.
a: 1.we have 30 years working experience in railway and mining construction.
2. we have 31 professional engineers and 6 overseas office for better after-sales service .