fixed mine wagon used in the coal mine roadway transportation, large of small and medium- sized inclined shaft, small slope along the groove and the mine ground transportation.
car by car, stationary harvesters - frame, wheel, shock absorber parts, stationary harvesters for coupling or cart baffle. when ordering, please indicate.welcome to contact us to negotiate with us to order products.mines in coal, ore and waste rock material such as narrow gauge railway transport vehicle, usually with winch or locomotive traction.
model definition(mgc3.3-9) m : for coal mine g: fixed model c: car/vehicle 3.3: capacity (m3) 9: gauge 900mm | |
flat rail wagon features made by high quality steel high stress area welds eliminated mass and section thickness optimized long service time simplified state of the art mainframe and easy to operate | |
fixed rail wagon application fixed mine cars are suitable for surface and underground of the mine to transport the ore and other waster materials. |
fixed mine wagon structure it is composed of carriage, frame, open wheel set, connection bolt, connection chain, bolt pin, split pin, washer etc. |
model | mgc1.7-6 | mgc1.7-9 | mgc1.1-6 | mgc3.3-9 |
volume(m³) | 1.7 | 1.7 | 1.1 | 3.3 |
theoretical capacity (t) | 1.5 | 1.5 | 1.1 | 3 |
max. load (t) | 2.7 | 2.7 | 1.8 | 3 |
gauge(mm) | 600 | 900 | 600 | 900 |
wheel base(mm) | 750 | 600 | 550 | 1100 |
wheel diameter (mm) | 300 | 350 | 300 | 350 |
traction(kn) | 60 | 60 | 60 | 60 |
traction height(mm) | 320 | 320 | 320 | 320 |
overall size(lxwxh) | 2400*1050*1200 | 2100*1150*1300 | 2000*880*1150 | 3450*1320*1300 |
weight(≤kg) | 720 | 970 | 610 | 1320 |
a: we are a manufacturere with 7 branch factories and 6 overseas offices.
a: generally, within 15-25 days after deposit received.
a: warmly welcome! once we have your schedule, we will arrange the professional engineers and salesperson to follow up your case.
a: available upon request.
a: tt b. western union c. lc d.upon request
a: yes. please inform us formally before our production and confirm the design firstly.
a: 1.we have 30 years working experience in railway and mining construction.
2. we have 31 professional engineers and 6 overseas office for better after-sales service .